Istanbul Financial Center Basement Wall Geofoam Backfill

Ümraniye / Istanbul

Site Conditions

  • The subsurface profile consisted of uncontrolled fill material.
  • A road embankment was planned to be constructed over the uncontrolled fill.
  • Without ground improvement, a conventional compacted soil embankment would have created stability problems within the uncontrolled fill under the design loads.
  • The construction area was located between viaduct foundations, resulting in restricted access and difficult mobilization of heavy construction equipment.
  • Conventional ground improvement methods were disadvantageous in terms of overall project cost, constructability and construction schedule.
  • A 7 m high conventional fill would have imposed substantial lateral earth pressures on the existing basement wall of the parking structure.

Designed Solution

  • Construction of the road embankment using geofoam block technology.

Advantages of the Applied Geotechnology

  • The road embankment could be constructed without causing stability problems within the underlying uncontrolled fill.
  • Lateral earth pressure acting on the basement wall was effectively eliminated.
  • The project was completed within a substantially shorter construction period compared with conventional construction methods.
  • The solution provided a more economical alternative in terms of total project cost compared with conventional ground improvement methods.