YC Inox Factory Geofoam Block Stepped Fill for Recreational Use

Dilovası, Kocaeli

Site Conditions

  • A stepped fill was required for recreational use beneath an existing viaduct constructed to provide internal transportation within the factory site.
  • Construction of a conventional engineered fill using placement and compaction procedures was disadvantageous in terms of equipment mobilization and construction duration.

Designed Solution

  • Construction of the stepped fill using geofoam block technology.

Advantages of the Applied Geotechnology

  • Compared with conventional engineered fill construction requiring placement and compaction, the project was completed within a substantially shorter construction period without major equipment mobilization constraints.