Geofoam Highway Embankment Over a Piled Retaining Structure

Başakşehir / Istanbul

Site Conditions

  • A roadway embankment up to 3 m high was planned to be constructed over an existing piled retaining structure, although this additional load had not been considered as a service load in the original retaining system design.
  • A reinforced concrete retaining wall had been constructed on top of the pile cap beam to accommodate the roadway embankment.
  • The stress increases induced by construction of the roadway embankment would have adversely affected the stability of the existing retaining structure.
  • Prior to construction of the reinforced concrete metro shaft structure, the spaces between the waler beams of the temporary shoring system had to be filled to obtain a level surface and reduce concrete consumption.

Designed Solution

  • Construction of the roadway embankment using geofoam block technology.

Advantages of the Applied Geotechnology

  • The roadway embankment could be constructed without causing stability problems in the existing piled retaining structure.
  • The geofoam block layout was designed according to a zero lateral earth pressure concept, preventing lateral loads from being transferred to the reinforced concrete retaining wall constructed above the pile cap beam.

Performance Under Service Loads

  • A comprehensive instrumentation program was implemented using settlement plates and earth pressure cells.
  • Periodic measurements have been collected since the roadway was opened to traffic on November 1, 2017.